Home › Guides › What signage does a new business need?
What signage does a new business need?
Opening a shop, unit or office in Manchester? Here is the signage checklist, in the order that actually matters.

First: the sign that finds you customers
The fascia. It is the single highest-impact spend at opening — it announces you exist, sets your brand, and works every hour of every day. Order it first, because manufacture and possible consent take the longest lead time of anything on this list.
The opening checklist
What most new premises actually need, roughly in order:
What to skip at launch
Fancy extras before fundamentals: skip the neon feature wall until the fascia, window and statutory signs are handled. A launch banner is cheap and does the short-term shouting; permanent extras can follow once trade proves what you need. Spending the whole budget on one hero item and opening with paper in the window is the classic new-business signage mistake.
One order, one team
Everything on the checklist comes out of one workshop here — designed together so the fascia, window, A-board, van and print all match. One survey, one fixed quote, one fitting schedule timed to your opening date.
Quick answers
How far ahead should I order signage before opening?
Start at least a few weeks out — longer if illumination or consent is involved. The fascia has the longest lead time; print can arrive in 24 hours.
What statutory signs does a premises need?
Fire exit and safety signage appropriate to the premises, and sector-specific notices where regulations require them. We supply compliant safety signs alongside the branding.
Can you do everything in one package?
Yes — fascia, windows, interior, A-board, van and print quoted together, produced together, and fitted to your opening date.
Related
Ready to get
a price?
Free quote in 60 seconds. Free design included. Fixed price, no surprises.